Supporting Veolia in Maintaining Nagpur’s Water Supply

| Endobot
Location: Nagpur
Status Quo
  • Contamination and blockage in pipelines with diameter of 75-400mm
  • Expensive leak-detection interrupting water supply in network, with age of 10-30 years
Client Requirements
  • A proactive approach to pipeline maintenance

  • Cost, time, and manpower reduction in leak detection

Solutions Deployed

Endo90

Endo250

Project Execution
  • Surveying for determining crucial pipeline parameters
  • Pitting for inspection, and analysis of gathered data

The Solinas Impact

    • Real-time defect identification
    • Digitization of underground network
    • Reduced water loss
Taken to detect each defect,
down from 8 hours before
0 hr
Of pipelines digitized
in the project
0 km
Needed per defect,
down from 5 before
0 digs
Defects identified
0
Scroll to Top