August 19, 2025 Supporting Veolia in Maintaining Nagpur’s Water Supply | Endobot Location: Nagpur Status Quo Contamination and blockage in pipelines with diameter of 75-400mmExpensive leak-detection interrupting water supply in network, with age of 10-30 years Client Requirements A proactive approach to pipeline maintenanceCost, time, and manpower reduction in leak detection Solutions Deployed Endo90 Endo250 Project Execution Surveying for determining crucial pipeline parametersPitting for inspection, and analysis of gathered data The Solinas Impact Real-time defect identificationDigitization of underground networkReduced water loss Taken to detect each defect, down from 8 hours before 0 hr Of pipelines digitized in the project 0 km Needed per defect, down from 5 before 0 digs Defects identified 0