Case Studies

Case Studies

Supporting Veolia in Maintaining Nagpur’s Water Supply

| EndobotLocation: NagpurStatus Quo Contamination and blockage in pipelines with diameter of 75-400mm Expensive leak-detection interrupting water supply in network…
Read Case Study

Helping SUEZ Reduce Coimbatore’s NRW

| EndobotLocation: CoimbatoreStatus Quo Leak detection was costing Rs 28,000 per defect Each leak was taking 3 days to be…
Read Case Study

Solving Septic Tank Issues For TAHDCO

| HomoSEPLocation: Kolathur, ChennaiStatus Quo Multiple instances of septic-tank clogging and overflow Manual cleaning required 2 days Client Requirements Pilot…
Read Case Study

Robotic Sewer Cleaning For Madurai Municipal Corporation

| HomoSEPLocation: MaduraiStatus Quo Manual methods being used for sewerage maintenance Client Requirements Pilot robotics for digitizing process Solutions Deployed…
Read Case Study

Helping SIDGCL Maintain Goa’s Sewerage Network

| EndobotLocation: PanjimStatus Quo Flow issues in 92m pipeline stretch near key Sewage Treatment Plant Client Requirements Inspect two manholes…
Read Case Study

Scroll to Top